const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":102,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-30 14:43:56.611601","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-30 14:43:56.611608","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-30 14:43:56.611611","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
When AFC Bournemouth were promoted to the Premier League, they rapidly needed to install a new Training Pavilion to facilitate the additional space needed for the Premier League requirements.
Project overview
Client:
AFC Bournemouth
Project:
Training Pavilion
Completed:
August 2015
Services provided
Management
Groundwork
Manufacturing
Delivery
When AFC Bournemouth were promoted to the Premier League, they rapidly needed to install a new Training Pavilion to facilitate the additional requirements needed for the Premier League.
With their first season in Premier League football approaching, there was only a six week build period to construct and fit out the Training Pavilion.
With a high specification design, the Training Pavilion provides staff and players with all the facilities needed to perform to the best of their physical ability.
With a particular attention on player fitness and physical well-being, the building was to cater for player and staff needs whilst performing at the highest level of English football.
With dedicated areas to allow the Club’s sporting performance staff to provide the very highest levels of player care, AFC Bournemouth now have the facility to compete in the world’s most competitive football league.
We knew it was going to be a big moment getting our training base in one venue, improving our facilities in line with the premier league, and we feel now we have a club that is moving forward into the league that we are in. What impressed me most was the speed of how they worked, the quality of their craft, and the manner in which they did it – everyone we dealt with was very friendly to deal with,– this has contributed to the overall standard, of what we are trying to deliver to the players, which in turn it will help results – maybe not directly, but when you combine everything together it was a huge step for the club so can’t thank everyone enough
Eddie HoweAFC Bournemouth’s ManagerAFC Bournemouth
Flexible solutions for any size of Sports and Leisure Clubs
With modular construction there is less time spent on site compared to traditional building methods, making your build faster and cost-efficient. Allowing you to create something that will benefit you and your community.
Modular buildings are flexible. They can be smart. They can be casual. They can be whatever you need them to be.
When Wolverhampton Wanders got promoted to the Premier League, they required a very fast building solution to make the transition and meet the requirements of the Premier League.
St. George’s commissioned an architecturally designed changing pavilion for their college site. The costs received for a traditional build contract were beyond the school's budget. Modulek were invi...
Hamble Marina were looking to expand their retail outlet and attract new clientele to their beautiful location. Eight additional retail units were required to fulfil their growth plans.