foundry lane primary school’s
brand new kitchen and dining extension
Foundry Lane Primary School is a founder member of the Southampton Co-operative Learning Trust and is a vital part of the local community. An extension was needed to the existing kitchen and dining facilities to improve and increase the area available for staff and pupils.
key details
project overview
duration
9 weeks
completed
20100902
services provided
Brick cladding
Commercial kitchen installation
Design
Extraction system installation
Groundwork
Installation
Manufacturing
On-site roof construction
Service Connections
I am very pleased with the end result, and the effective way the project has been delivered.
– project officer
requirements
Foundry Lane Primary School had a requirement for a brand new kitchen and dining extension to an existing building. The design team created a bespoke specification to cater for new facilities which were needed to replace the existing layout. Modulek provided the school with a large commercial kitchen and servery which has enabled the school to provide a superior environment for staff and pupils.
An extensive scope of works was included for the kitchen and a specialist extraction system installation.
To blend in the extension the building was linked and finished with a brick clad to match the external traditional appearance.
modular school buildings
Modern Methods of Construction lend themselves perfectly for the design and construction of new school buildings that benefit from a truly unique modular approach.
A modular school building is one that is constructed off-site as individual units and is then transported to site and erected into a complete building. Modular school buildings are the perfect solution to additional classroom blocks, sports halls, science labs, humanities blocks and sixth form buildings. The end results is often indistinguishable from a traditional school building.