const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":2905,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-29 23:36:25.484405","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-29 23:36:25.484411","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-29 23:36:25.484414","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
Kinson Academy has the special status of being Bournemouth’s oldest school. It was established in 1836 and is very much a community school with many parents and grandparents being able to relate their own memories of the school.
Project overview
Floor area
740m2
Services provided
Design
Manufacturing
Delivery
Installation
Internal fit out and finishing
Groundwork
Construction of the fire escape staircase
Natural ventilation system
A member of Ambitions Academy Trust, Kinson Academy has received significant support to ensure that all children receive a high quality of care and education.
There was a need for a brand-new school kitchen, classroom and a bright and spacious main hall building.
With a budget to fit within a turnkey solution was provided to design and construct a half modular and half streel frame building.
A key requirement of the design was to provide natural ventilation to the main school hall. This system naturally ventilates the hall without the need of mechanical pumps and further equipment. An environmentally friendly modern solution which is much more economical than traditional systems.
Modulek project managed the build from its initial concept to completion, including all groundworks, delivery and installation and external finishing, the traditional steel frame hall, ramps, paths steps, drainage, gas & electricity supply, facing brickwork and interior fit out.
St. Edmund’s is an independent co-educational day school for boys and girls from 2 to 16 years. Made up of four parts, Little Ed’s Nursery and Reception, Lower Prep & Prep, Senior Prep and Senior ...
Faced with a demolition of their traditional construction three storey school block which was dilapidating structurally, the school had an urgent need for a brand-new building.
Space was required fo...
With a growing school population, Kingsleigh Primary School had an urgent need to expand their school and teaching facilities. A new building and an extension was desperately required to accommodate r...