peter symonds college’s
rescue project for a new school facility
Modulek rescued a project that had run out of time for a traditional build solution. With our unique hybrid construction method, our design team were able to replicate the same three storey design, deliver and construct all within the timeframes required by the client.
key details
project overview
duration
10 weeks
Floor Area
400m2
services provided
Delivery
Design
Groundwork
Installation
Internal fit out and finishing
Management
Off site construction
Service Connections
planning a new classroom block?
requirements
With a completion date set for the start of the Autumn Term, the building was put into off-site production and delivered to site on the first day of the Summer Holiday.
The build was completed in just six weeks and was ready for students at the start of the Autumn Term as required.
the building
The new facility was designed to blend with the existing buildings on site, while also bringing into the setting a sleek modern external appearance.
Four Science Laboratories, a Library, and a Preparation Room gave the College the additional space they needed to enhance the learning and working environment for students and staff.
Part of the unique design of this building, was the three-storey construction.
The roof was designed in five sections; formed to the full pitch. A key to the project being completed on time as the internal work was able to progress the day after delivery.