const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":2556,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-29 21:45:48.874582","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-29 21:45:48.874589","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-29 21:45:48.874592","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
Solihull Sixth Form College needed to build a new two storey Science Block. A large and busy site meant that disruption had to be kept to a minimum.
Traditional Build was not an option due to the length of time required on site and the impact of the disruption it would cause to the college.
Project overview
Completed
July 2020
Floor Area
1500m2
Project duration
20 weeks
Services provided
Design
Manufacturing
Groundwork
Delivery
Installation
Internal fit out and finishing
To accommodate present and future needs, Solihull Sixth Form College required a new two storey science block and an additional classroom.
Click on the image below to watch the amazing Solihull 6th Form College time-lapse video
It was vital that disruption was kept to a minimum, so that students at key points in their studies could continue to focus through the build period.
Modulek provided a full turnkey solution from initial idea, to completion, providing a bespoke teaching block which had the look and feel of a traditional building.
Modulek worked with the client, to create a state-of-the-art design specification which included all the interior fit out.
The building was delivered and lifted into position over a four day period.
The new science block will now be used as a showcase block of classrooms to prospective future students, who are interested in STEM subjects.
Modulek rescued a project that had run out of time for a traditional build solution.
With our unique hybrid construction method, our design team were able to replicate the same three storey design, ...
Springwood School in Bournemouth is a specialist school for students with autism, and required a new bespoke building, to enhance their educational and supported learning on their existing school site...
Faced with a demolition of their traditional construction three storey school block which was dilapidating structurally, the school had an urgent need for a brand-new building.
Space was required fo...