const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":2517,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-29 19:50:34.408744","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-29 19:50:34.408750","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-29 19:50:34.408753","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
Springwood School in Bournemouth is a specialist school for students with autism, and required a new bespoke building, to enhance their educational and supported learning on their existing school site.
Modulek used their unique hybrid construction method to create a purpose-built school to enable students to achieve their full potential, in a supported environment.
Project overview
Client
BCP Council/Linwood School
Project
SEN School
Completed
December 2013
Floor area
700m2
Services provided
Design
Manufacturing
Delivery
Foundations
Installation
Internal fit out and finishing
CCTV system
Through a detailed understanding of what the school required Modulek designed a unique building which catered internally and externally with every facility to assist children with learning difficulties.
The building includes a sensory suite with soft play, music, speech and language rooms and a smaller room for 1-1 work. There is also a school hall, a kitchen and reception area.
Curved walls were introduced as these are preferred by the students and have beneficial advantages to the learning environment.
To assist with reduced maintenance, anti-vandal window blinds were included as part of the design specification.
External works included boundary fencing, timber decking, landscaping and tree planting.
‘The spacious classrooms and corridors, state of the art ICT and sensory rooms, individual class play areas and accessible toilets from classrooms will help our pupils to be more independent. We are absolutely delighted with these new facilities’.
With a growing school population, Kingsleigh Primary School had an urgent need to expand their school and teaching facilities. A new building and an extension was desperately required to accommodate r...
Faced with a demolition of their traditional construction three storey school block which was dilapidating structurally, the school had an urgent need for a brand-new building.
Space was required fo...
Modulek rescued a project that had run out of time for a traditional build solution.
With our unique hybrid construction method, our design team were able to replicate the same three storey design, ...