const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":4534,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-30 02:06:00.703731","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-30 02:06:00.703738","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-30 02:06:00.703741","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
Lady Eleanor Holles school, is a leading independent school for girls that provides education from junior school age through to sixth form. With a growing number of pupils on roll, the school required...
Due to a sharp rise in student numbers, Unsworth Academy had an urgent need to create more space. With pupil numbers set to soar above 1000 a new six-classroom block was required to house the extra ca...
Modulek’s value engineering expertise enabled them to win the tender for this project. The building was not able to be built in traditional construction due to exceeding the available budget. With d...
Bridgewater Hamp Academy required 3 new classrooms and a muti use activity space for children and staff. One of the key requirements was to keep the new building in keeping with the existing ones on s...
West Kidlington Primary School needed six new classrooms within a short timeframe for emergency replacement of existing buildings that had been condemned as dangerous for use. Modulek installed six mo...
Reigate St Mary’s Prep and Catholic School had an urgent need for more classroom space due to an expansion in student numbers. With limited access due to clubs running at the school and the build ta...
Bayhouse School in Gosport had a need to replace dilapidated mobile classrooms with 10 new permanent classrooms and also a accommodate new space for a ‘Marine Training Centre’ for both school and ...
Nestled in the heart of the Wiltshire countryside in the historic town of Calne, John Bentley School required a single storey 3 classroom block which included an office for the teaching staff along wi...
St. Edmund’s is an independent co-educational day school for boys and girls from 2 to 16 years. Made up of four parts, Little Ed’s Nursery and Reception, Lower Prep & Prep, Senior Prep and Senior ...
Jewell Academy, which is a member of the Aspirations Academies Trust, needed to expand their teaching facilities and build 14 new classrooms in a very short time frame. Our unique hybrid construction ...
With a growing school population, Kingsleigh Primary School had an urgent need to expand their school and teaching facilities. A new building and an extension was desperately required to accommodate r...