find out more about

value engineering

Do you have a building project that has been over designed, tendered and come out over budget?

Do you have a project that has been delayed due to planning or other influences and is behind programme?

If you are in either of these situations, we can help.

find out more on

what is value engineering?

Defined Budget

Defined Budget

Clear knowledge of the project budget to ensure that value engineering efforts align with financial constraints and objectives.

Design and Build

Design and Build

Prerequisite, of a true design and build solution permitted, with any previous design documents and specifications null and void.

Spatial Requirements

Spatial Requirements

The project should have the flexibility for allowing a revisit of the existing layout, and a potential reduction of floor area may be required.

Exclusivity Commitment

Exclusivity Commitment

There is a commitment to project exclusivity with no intellectual property transfer or re-tendering permitted.

how does this effect the planning process?

value engineering made easy

is value engineering for you?

criteria check list

Is there flexibility to allow the specification and design to be altered?

Can we operate on a true design and build basis as the principal designer and contractor?

If the answer is ‘yes’, we can help