Do you have a building project that has been over designed, tendered and come out over budget?
Do you have a project that has been delayed due to planning or other influences and is behind programme?
If you are in either of these situations, we can help.
Modulek are modular construction experts who specialise in value engineering overdesigned traditional build projects, bringing the project cost back to a set budget.
find out more on
what is value engineering?
This methodology helps to control costs without compromising on the overall quality.
Modulek’s value engineering process is a smart solution which combines creative design, innovative ideas, and informed project recommendations.
Our solution involves taking the project back to the drawing board and redesigning with cost and spatial efficiencies in mind but still delivering on core requirements.
Our unique hybrid construction method will unlock any stalled, traditionally specified project and deliver a simplified solution that is tried and tested as fit for purpose and still looks the part.
The ultimate solution for cost conscious project leaders looking to get stalled projects back on track quickly and efficiently.
the process of reducing the cost of producing a product without reducing its quality or how effective it is
the process of reducing the cost of producing a product without reducing its quality or how effective it is
what is the qualifying criteria for
value engineering projects
There are four important criteria checks that need to be met before the process can proceed.
how does this effect the planning process?
In most cases, the project would need an amendment to planning consented design. As part of our process, we endeavour to minimise changes as much as possible to reduce the impact on any planning permission obtained.
Our Value Engineering service includes resubmission and management of the planning process on your behalf. Alternatively, we can provide all the necessary drawings and documentation to your appointed professional should they be retained.
value engineering made easy
Our modular solutions provide a rapid, economical alternative to traditional building. With off-site pre-assembly, minimal ground preparation and fast on-site installation.
The pre-construction phase is also quicker with standardised designs and practices.
Employing advanced steel space frame technology, precision manufactured to the exact incremental dimensions required, flexible to produce any layout or configuration.
Finishes are of the highest quality, produced in a factory-controlled environment, with assembly line precision processes.
All buildings are fully Building Regulation compliant, ensuring that the design incorporates the highest standard of insulation, structural strength, low carbon emission, and fire precautions.
is value engineering for you?
criteria check list
Is there flexibility to allow the specification and design to be altered?
Can we operate on a true design and build basis as the principal designer and contractor?
If the answer is ‘yes’, we can help
check out
some of our most recent blog posts
26 Jun 2024
Modulek Feature in Independent Schools Magazine April 2024
click to read post
14 May 2024
Examining The Benefits of Value Engineering in Construction: Advantages, Disadvantages, and Solutions
click to read post
12 Mar 2024
How to Choose an Architect for a School Building
click to read post