const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":3149,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-29 23:36:21.598910","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-29 23:36:21.598916","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-29 23:36:21.598919","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
A thriving Roman Catholic school in Bournemouth was in dire need to expand its teaching facilities to accommodate increasing local demand for places.
Project overview
Floor area:
678 m2
Services provided
Design
Groundwork
Manufacturing
Delivery
Installation
Internal fit out and finishing
The project was for an extension to the existing school site to accommodate six new classrooms and a library.
The design brief was for the new building to blend with the existing school site and to be completed within the short time frame of the school summer holidays and fit the school’s budget.
A turnkey solution from Modulek enabled the building to be put quickly into manufacture whilst the on-site team prepared the ground.
The site raised logistical challenges due to accessibility and a confined space to work around but our experienced Project Management team were able to solve these concerns and issues and the new building was successfully delivered, installed, and fitted out over the school holiday.
Delighted staff and pupils were welcomed into their new building at the start of the new autumn term.
Jewell Academy, which is a member of the Aspirations Academies Trust, needed to expand their teaching facilities and build 14 new classrooms in a very short time frame. Our unique hybrid construction ...
Situated on a beautiful 16 acre site and home to 2 listed buildings, Beech Hall School needed to demolish an existing building and replace with a brand new Science and Technology space. With restricte...
Speed of construction and fitting the budget was priority for Heathlands Primary School. With ages ranging from Pre School up to Year 6, the school needed additional space and wanted a bright and mode...