const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":3161,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-29 23:35:25.804203","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-29 23:35:25.804210","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-29 23:35:25.804213","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
Hedgewood School is a rapidly expanding primary school located in the Hillingdon Local Education Authority.
It caters exclusively for children with special educational needs along with supporting children and families outside of school hours and in holiday time.
Project overview
Client:
London Borough of Hillingdon
Floor area:
400 m2
Project Completed:
14 weeks
Services provided
Design
Groundwork
Drainage
Service Connections
Manufacturing
Delivery
Installation
Relocation of existing building
External works including landscaping
With a growing need to offer more spaces to children, Hedgewood School needed to provide additional teaching space. Having been turned away by other contractors due to the complexity of the build location, Modulek were able to offer a turnkey solution which others couldn’t.
Welcoming children with special educational needs the design element of this project was crucial. There are features included within the building design to ensure that every child has the best environment to feel safe and secure and allow the teaching and support staff to support every child to the best of their ability.
Quiet areas were incorporated into the building design so that any child who was feeling overwhelmed could escape to and receive the support they needed in a safe area.
Large classrooms with plenty of open space were important so that the teaching staff could encourage active learning and the children could have the freedom to express themselves freely.
The external area was just as important as the internal layout. The building was needed to be built into a small area within the existing site, so ensuring connectivity to the adjacent and adjoining classrooms was very important.
Keeping disruption to a minimum was of real importance so building work was completed during the school summer holidays and completed in time for the new term.
Situated on a beautiful 16 acre site and home to 2 listed buildings, Beech Hall School needed to demolish an existing building and replace with a brand new Science and Technology space. With restricte...
Jewell Academy, which is a member of the Aspirations Academies Trust, needed to expand their teaching facilities and build 14 new classrooms in a very short time frame. Our unique hybrid construction ...
With a growing school population, Kingsleigh Primary School had an urgent need to expand their school and teaching facilities. A new building and an extension was desperately required to accommodate r...