const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":1262,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-29 23:36:35.674321","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-29 23:36:35.674328","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-29 23:36:35.674331","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
Modulek rescued a project that had run out of time for a traditional build solution.
With our unique hybrid construction method, our design team were able to replicate the same three storey design, deliver and construct all within the timeframes required by the client.
Project overview
Client:
Peter Symonds College
Project:
Classroom Building
Completed:
August 2013
Services provided
Design
Manufacturing
Groundwork
Service Connections
Installation
Internal fit out and finishing
With a completion date set for the start of the Autumn Term, the building was put into off-site production and delivered to site on the first day of the Summer Holiday.
The build was completed in just six weeks and was ready for students at the start of the Autumn Term as required.
The new facility was designed to blend with the existing buildings on site, while also bringing into the setting a sleek modern external appearance.
Four Science Laboratories, a Library, and a Preparation Room gave the College the additional space they needed to enhance the learning and working environment for students and staff.
Part of the unique design of this building, was the three-storey construction.
The roof was designed in five sections; formed to the full pitch. A key to the project being completed on time as the internal work was able to progress the day after delivery.
Lytchett Minster is a successful and popular comprehensive school with a large and thriving sixth form. Due to an increase in student numbers, they had an urgent need for a new classroom block. A key ...
Moon Hall School had a need to bring all of their learning environments together to consolidate the learning experience and environment for their pupils. There was a need for a building that could hou...
Lady Eleanor Holles school, is a leading independent school for girls that provides education from junior school age through to sixth form. With a growing number of pupils on roll, the school required...
Bournemouth Borough Council had an urgent need to replace existing changing rooms at the rugby club as they were no longer fit for purpose. Modulek demolished the old site, with the new changing rooms...