const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":4328,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-12-01 10:20:55.048075","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-12-01 10:20:55.048082","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-12-01 10:20:55.048085","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
The Chalet School required a new learning environment for additional pupils.
After successfully receiving LEA funding, the special education setting needed to accommodate the extra pupils. Building requirements included classrooms, a kitchen, and toilets.
Project overview
CLIENT:
Brunel Academies Trust
Project Value:
£565,000
TURNKEY ELEMENTS PROVIDED
Services provided
Design
Management
Foundations
Groundwork
Service Connections
Paths and Fencing
Landscaping
Requirements
After receiving LEA funding, the school required extra space to facilitate an increase in pupil numbers. As a special education setting, the learning environment needed to reflect the needs of the pupils using the space. A full turnkeyservice was required for this project, with the building requirements including a classroom area, a kitchen area, and toilets. All self-contained within the new learning environment, the new facilities helped promote independence for the pupils at the school.
The Building
The building is a single-story classroom block made up of 3 modules with facilities including toilets, a kitchen a storeroom, and a lobby. As part of Modulek’s full turnkey solution, all service connections and bespoke external finishes were provided. Disabled access was created with a tarmac pathway around the building, ensuring level access for pupils. External finishes on the build included a mixture of thermowood timber cladding and steel cladding.
Lytchett Minster is a successful and popular comprehensive school with a large and thriving sixth form. Due to an increase in student numbers, they had an urgent need for a new classroom block. A key ...
Moon Hall School had a need to bring all of their learning environments together to consolidate the learning experience and environment for their pupils. There was a need for a building that could hou...
Lady Eleanor Holles school, is a leading independent school for girls that provides education from junior school age through to sixth form. With a growing number of pupils on roll, the school required...