const simpleBannerScriptParams = {"version":"2.16.0","hide_simple_banner":"yes","simple_banner_prepend_element":false,"simple_banner_position":"initial","header_margin":"","header_padding":"","simple_banner_z_index":false,"simple_banner_text":"Our next conference is in Warwickshire on 18th \u2013 20th May 2023, at the ISA Annual Conference. <a href=\"https:\/\/modulek.co.uk\/conference-dates\/\">Find out more.<\/a>","pro_version_enabled":"","disabled_on_current_page":false,"debug_mode":"","id":4054,"disabled_pages_array":[],"is_current_page_a_post":false,"disabled_on_posts":"","simple_banner_font_size":"","simple_banner_color":"#a30000","simple_banner_text_color":"","simple_banner_link_color":"","simple_banner_close_color":"","simple_banner_custom_css":"","simple_banner_scrolling_custom_css":"","simple_banner_text_custom_css":"","simple_banner_button_css":"","site_custom_css":"","keep_site_custom_css":"","site_custom_js":"","keep_site_custom_js":"","wp_body_open_enabled":"","wp_body_open":true,"close_button_enabled":"on","close_button_expiration":"","close_button_cookie_set":false,"current_date":{"date":"2023-11-29 16:34:31.958362","timezone_type":3,"timezone":"UTC"},"start_date":{"date":"2023-11-29 16:34:31.958368","timezone_type":3,"timezone":"UTC"},"end_date":{"date":"2023-11-29 16:34:31.958371","timezone_type":3,"timezone":"UTC"},"simple_banner_start_after_date":false,"simple_banner_remove_after_date":false,"simple_banner_insert_inside_element":false}
The school required a full turnkey package for this project including demolition of the old site, full planning and design, off-site construction and installation. Modulek worked with construction consultants after a successful CIF bid was awarded for the building work. Involved from beginning to end, a turnkey service provided ease of communication and speed to this school project.
The school required a full turnkey package for this project including demolition of the old site, full planning and design, off-site construction and installation. Modulek worked with construction consultants after a successful CIF bid was awarded for the building work.
Project overview
Project value
£800K
Project duration
16 weeks
Completed
2022
Services provided
Design
Planning
Management
Foundations
Demolition
Service Connections
Paths and Fencing
Involved from beginning to end, a turnkey service provided ease of communication and speed to this school project:
“The great thing about early engagement on a school project is all the early considerations that are made. Such as the discussions about safeguarding the children within the school environment. Considerations for the wider community, such as neighbours. Logistics of how the materials are going to come into a busy school environment. All of these were considered by Modulek, enabling the build to run as smoothly as possible.”
Sarah Hickman, Central Liaison Officer, Viking Academy Trust.
Access and aesthetics were key challenges for this build, as the school is located on a narrow residential road. Neighbours are also in close proximity, so getting the design of the Sports hall right was paramount to a successful planning submission.
The Building
The school needed a brand new Sports hall with toilets, changing rooms and a kitchen area delivered within a fixed budget and timeframe set by CIF funding for the project. A true hybrid construction method was the only build method that could meet this requirement. A mix of modular for the changing and kitchen building was adjoined to a portal frame sports hall, using a traditional construction method assembled on-site.
The end result has provided huge benefits to children and sports leaders at the school. The self-contained facilities now allow children to change and access the toilets on site. This means little time is wasted through transitions back and forth from the schools main site and the sports hall. Allowing for more sport to be enjoyed and carried out.
Please watch our video to find out more about the outstanding new sports environment Modulek provided.
See how much the new sports hall means to the pupils and teachers:
Lytchett Minster is a successful and popular comprehensive school with a large and thriving sixth form. Due to an increase in student numbers, they had an urgent need for a new classroom block. A key ...
Moon Hall School had a need to bring all of their learning environments together to consolidate the learning experience and environment for their pupils. There was a need for a building that could hou...
Lady Eleanor Holles school, is a leading independent school for girls that provides education from junior school age through to sixth form. With a growing number of pupils on roll, the school required...