Education building

Fred Longworth High School

Download this case study

fred longworth high school’s

new humanities block

Modulek work with many property professionals to design and construct new school buildings that meet CIF guidelines. A successful partnership with Stratus9 Consulting Ltd on behalf of Fred Longworth High School to successfully gain CIF funding for a new Humanities Block for the popular school in Manchester.

fred longworth high school

why modulek was the right choice

key details

project overview

duration

20 weeks

floor-area

1155 m2

services provided

Delivery

Design

Groundwork

Installation

Manufacturing

Service Connections

requirements

Fred Longworth High School have an ongoing relationship with Stratus9 Consulting Ltd to develop and implement their property strategy for the replacement of their end-of-life buildings.

Working with Stratus9 Consulting from the initial CIF funding bid development stage gave our design team the opportunity to create from a blank canvas the badly needed Humanities Block.

When the successful CIF application was approved Modulek were ready to prepare the site which included demolition of an existing building before any groundwork could commence.

Deliveries to site were organised around school hours to minimise disruption and congestion around the school site.

fred longworth high school

watch the delivery and build of the new Humanities Block

the building

The three-storey building provides spacious teaching areas, washroom facilities, meeting areas for teaching staff and office space.

Phase 1 of the school’s property strategy was completed in 20 weeks on site and all within budget.

Download this case study

Fred Longworth High School

pdf file – 808KB