Ringwood School is a highly successful and thriving school and has an ‘outstanding’ approval from Ofsted. Successful funding from the Government’s Condition Improvement Fund was won to replace t...
Brewood School is an independent specialist day school which provides dedicated and specialist teaching to a diverse group of pupils with special educational needs.
Set in a beautiful Victorian setti...
Solihull Sixth Form College needed to build a new two storey Science Block. A large and busy site meant that disruption had to be kept to a minimum.
Traditional Build was not an option due to the len...
Situated on a beautiful 16 acre site and home to 2 listed buildings, Beech Hall School needed to demolish an existing building and replace with a brand new Science and Technology space. With restricte...
Foundry Lane Primary School is a founder member of the Southampton Co-operative Learning Trust and is a vital part of the local community. An extension was needed to the existing kitchen and dining fa...
Jewell Academy, which is a member of the Aspirations Academies Trust, needed to expand their teaching facilities and build 14 new classrooms in a very short time frame. Our unique hybrid construction ...
Springwood School in Bournemouth is a specialist school for students with autism, and required a new bespoke building, to enhance their educational and supported learning on their existing school site...
With a growing school population, Kingsleigh Primary School had an urgent need to expand their school and teaching facilities. A new building and an extension was desperately required to accommodate r...
St. George’s commissioned an architecturally designed changing pavilion for their college site. The costs received for a traditional build contract were beyond the school's budget. Modulek were invi...
Faced with a demolition of their traditional construction three storey school block which was dilapidating structurally, the school had an urgent need for a brand-new building.
Space was required fo...
Modulek rescued a project that had run out of time for a traditional build solution.
With our unique hybrid construction method, our design team were able to replicate the same three storey design, ...